Up to $22.9 million will be allocated to the City of Sheridan for infrastructure improvements prioritized as listed in the table below. Projects are prioritized based on infrastructure condition, availability of grants and other funding, and public input. Click here for detailed project information and to view proposed City of Sheridan Capital Facilities Tax projects on a map.

ProjectDescriptionCapital Facilities
Tax Amount
Other FundingTotal
Estimated Cost
Total$22.9 million$49.91 million$72.81 million
Lewis St Bridge Reconstruction- Replace Lewis St Bridge due to poor condition
- Replace water, sewer, storm drain, sidewalks, curb/gutter, surfacing and enhancements
- Construct underpass for pedestrian safety
- Upgrade/connect water mains
$1.4 million$2.6 million$4 million*
Illinois Neighborhood Reconstruction- Replace street due to poor condition
- Replace aging water and sewer mains
- Replace undersized storm drain
$2 million$1 million$3 million
North Sheridan Interchange- Reconstruct N Main from railroad tracks to new interchange location at I-90
- Replace failing water mains (major concern)
- Part of plan to address WYDOT safety concerns w/ I-90 interchange
- Construct pathway extensions/enhancements
$6 million$34 million$40 million**
Loucks Street and Utility Project- Replace old and failing water mains
- Upsize sanitary sewer interceptor
- Address poor street condition
- New surfacing between curb and gutter
$1.5 million$1.5 million$3 million
Colony South Water Line Replacement- Replace failing water main
- Repair storm drain
- Street reconstruction
$1.552 million$1.3 million$2.852 million
West Downtown Phase IV - Replace storm drain, water mains, and sanitary sewer
- Reconstruct street
$2.55 million$1 million$3.55 million
Wyoming-Park Phase III- Replace storm drain, water mains, and sanitary sewer
- Reconstruct street
$1.918 million$1.51 million$3.428 million
North Heights Water Main Replacement- Replace failing water main
- Resurface street
$2 million$2.2 million$4.2 million
Big Goose Creek Sewer Upsize- Upsize insufficient sewer line
- Improve storm drain system
- Replace water, sanitary sewer mains and services
- Reconstruct street
$2.5 million$2.55 million$5.05 million
East Downtown Phase I- Replace storm drain, water mains, and sanitary sewer
- Reconstruct street
$1.48 million$2.25 million$3.73 million
*Includes WYDOT contribution of $1.9 million